Solid FoundationsBuilding · Franklin NZ
Back to blog
•Building Consents

Do I Need a Building Consent for a Deck in Franklin?

Do I Need a Building Consent for a Deck in Franklin?

If you're planning to build a deck in Franklin District, Pukekohe, Papakura, or Waiuku, one of the first questions you'll ask is: Do I need a building consent?

The answer depends on your deck's height, size, and location. Here's what you need to know.

When You DON'T Need a Building Consent

Low-level full-length deck along a transportable home, built without consent under the height exemption

Low-level deck along a transportable home — height above ground is what puts a deck inside or outside the exemption.

Under the NZ Building Code, you don't need a building consent if your deck meets all these criteria:

  • Height: Less than 1.5 metres above ground level
  • Size: No restrictions (can be as large as you want)
  • Location: Not affecting structural stability of your home
  • Fencing: If you add a guardrail, it must comply with code (but the deck itself still doesn't need consent)

This means most ground-level and low-level decks in Franklin District can be built without a consent.

When You DO Need a Building Consent

You need a building consent if:

  • Height: Your deck is 1.5 metres or higher above ground
  • Structural changes: You're altering your home's structure (e.g., attaching to load-bearing walls)
  • Plumbing/electrical: You're adding plumbing or electrical (e.g., outdoor kitchen, lighting)
  • Covered structures: If you're adding a roof or pergola over 10m², you may need consent

What About Pergolas?

Pergolas under 10m² don't need a building consent. If your pergola is larger than 10m², you'll need consent.

Franklin District Council Requirements

Franklin District Council (part of Auckland Council) requires:

  • Application form with detailed plans
  • Site plan showing deck location, boundaries, and setbacks
  • Construction details (footings, framing, connections)
  • Fee (varies by project size)

Processing time is typically 20 working days for straightforward applications.

Do I Need Consent for Fence Installation?

Most fences don't need a building consent unless:

  • Height exceeds 2.5 metres
  • You're in a special zone (heritage, coastal, etc.)
  • You're building a retaining wall over 1.5 metres

What About Renovations?

For home renovations in Papakura or Pukekohe:

  • Minor work (replacing cabinets, flooring): No consent needed
  • Structural changes (removing walls, adding rooms): Consent required
  • Bathroom/kitchen remodels: Consent needed if moving plumbing

How to Check if You Need Consent

  1. Check Auckland Council's website for specific rules
  2. Call Franklin District Council at 09 301 0101
  3. Ask a licensed builder (like Solid Foundations Building)

Get a Free Quote for Your Deck or Fence

If you're planning a deck, fence, or pergola in Franklin District, I can help. I offer:

  • Free on-site quotes in Pukekohe, Papakura, Waiuku, and Franklin
  • Building consent advice (I'll tell you if you need one)
  • Quality carpentry with 12+ years experience

WhatsApp me at +64 27 951 5272 or call to discuss your project.


This article is for general information only. Always check with Auckland Council for your specific project requirements.

Need help with your project?

I offer free on-site quotes in Franklin, Pukekohe, Papakura, and Waiuku.

CallWhatsApp